Greater London Demolition have delivered a vast remit of dismantling projects across the UK, below is a brief selection of projects that we have safely completed:


West Hendon Estate Regeneration, Hendon, London, NW9
  • Completed: July 2017
  • Programme: 8 months
  • Demolition Contract Value: £1.2M

Working as Principal Contractor

London South Bank University, Rotary Street, London, SE1
  • Completed: September 2017
  • Programme: 4 months
  • Demolition Contract Value: £435K

Working as Principal Contractor

St Dunstans House, Fetter Lane, London, EC4A
  • Completed: July 2013
  • Programme: 5 months
  • Demolition Contract Value: £935K

Working as Principal Contractor, Greater London Demolition provided full asbestos removal, before the internal strip out, coordinating the removal of waste in the busy City of London location. We undertook the intricate demolition of eight storey city centre office block. We achieved this by conducting floor by floor dismantling using mini excavators from floor eight to floor three then high reach demolition down to ground level. We finished by removing the basement and implementing temporary works. This complex project was completed in close vacinity to the University of London and sensitive Royal Court sessions so noise monitoring and daily liaison with local stakeholders to ensure disruption from demolition activities was kept to a minimum.

Twyman House, Camden Road, London, NW1
  • Completed: October 2012
  • Programme: 5 months
  • Demolition Contract Value: £430K

Working as Principal Contractor we carried out all demolition and associated works on this prominent Central London project. Located alongside the Regents Canal, GLD dismantled the lower level buildings before disassembling a six storey residential block. Greater London Demolition had numerous party walls to negotiate as well as providing close liason with many local residents affected by the works. Greater London Demolition removed all asbestos material before performing an intricate soft strip of the buildings. Once the demolition was complete all hard-standings and demolition arisings were removed from site for recycling.

Aberdeen Centre, Highbury Grove, London, N5

  • Completed : June 2012
  • Programme: 4 Months
  • Demolition Contract value: £355K

Greater London Demolition was responsible for the dismantling and site clearance on this renowned London location. The project involved the demolition of buildings and structures on this regeneration site down to the underside of basement level. The buildings ranged from two to five storeys in size. The project also included the removal and disposal of asbestos material from the various buildings.Due to the size of the site and the close proximity of local residents and schools, it was necessary to take particular care to diminish the impact of demolition activities.  Dust sprays were used as much as possible to minimise the effect of dust and weekly committees met to evaluate progress and liaise with local residents.

University of Reading, London Road Campus, Reading

  • Completed : January 2011
  • Programme: 4 Months
  • Demolition Contract value: £349K

Working as a Sub-Contractor, GLD undertook the demolition of three buildings whilst working within the restrictions of a live University campus. The detailed works involved the full strip out and M&E removal throughout the redundant buildings. This included the removal of lifts, ceilings and interior walls. Both pitched and flat roof structure sections were removed as well as the commissioning of temporary propping works.